Dust Storm Passing Over Spirit

The amount of electricity generated by the solar panels on Spirit has been declining for the past several Martian days, or sols, as a regional dust storm moved southward and blocked some of the sunshine at Spirit's location. The team operating the rover has responsively trimmed Spirit's daily activities and is keeping an eye on weather reports from observations by NASA's Mars Reconnaissance Orbiter.

Spirit's solar panels generated 392 watt-hours during the mission's Sol 2006 (Aug. 24, 2009), down from 744 watt-hours five sols earlier, but still generous compared with the 240 watt-hours per sol that was typical before a series of panel-cleaning events about four months ago.

"We expect that power will improve again as this storm passes, but we will continue to watch this vigilantly," said JPL's John Callas, project manager for Spirit and its twin, Opportunity. "Spirit remains power positive with healthy energy margins and charged batteries. The weather prediction from the Mars Color Imager team is that the storm is abating, but skies will remain dusty over Spirit for the next few sols."

Recent images from the Mars Color Imager camera on Mars Reconnaissance Orbiter showed this regional storm becoming less extensive Monday even as it shifted southward so that its southern edge covered the Gusev Crater area where Spirit is working. Malin Space Science Systems in San Diego, which operates that camera, provides frequent weather updates to the rover team.

Meanwhile, in JPL's In-Situ Instrument Laboratory, the rover team is continuing testing of strategies for getting Spirit out of a patch of soft soil where it is embedded on Mars. On Sol 2005 (Aug. 23, 2009) Spirit used its panoramic camera to examine the nature of how soil at the site has stuck to the rover's middle wheels. The team has also used Spirit's rock abrasion tool as a penetrometer to measure physical properties of the soil around Spirit by pressing into the soil with three different levels of force. The team is aiming to start sending drive commands to Spirit in September.


  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Computer Modeling Supplements Dusty Testing

Tests on Earth simulating Spirit's predicament on Mars have reinforced understanding that getting Spirit to rove again will be very difficult. To supplement the tests at NASA's Jet Propulsion Laboratory in Pasadena, Calif., the rover team is refining a detailed computer model of rover mobility, calibrated with results from testing and measurements from Mars. "The computer modeling will allow us to connect the results from tests performed in Earth gravity with what to expect from the rover in Mars gravity," said JPL's John Callas, project manager for Spirit and its twin, Opportunity. Spirit became embedded in soft soil at a site called "Troy" in early May, more than five years into a mission on Mars that was originally scheduled to last for three months. The rover team suspended further driving attempts with Spirit while evaluating possibilities from tests performed at JPL simulating the Troy situation.

An additional round of testing was added to the September schedule to gain more detailed assessment of how to move Spirit while avoiding putting the rover's center of gravity directly over a rock that is touching or nearly touching the rover's underbelly. Other added tests are using a lighter-weight test rover than the one used for most of the testing this summer. A complete "dress rehearsal" test of the extrication strategy judged to hold the best chance of success is planned in the test setup at JPL before the team commands Spirit to begin driving. That test and subsequent review of its results are expected to take several weeks. Moves by Spirit will not begin before October, according to current plans.

We are proceeding very cautiously and exploring all reasonable options," Callas said. "There is a very real possibility that Spirit may not be able to get out, and we want to give Spirit the very best chance. A dust storm that had reduced the electrical output from Spirit's solar panels by nearly half during late August still has some lingering effects on the skies above Spirit.

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

NASA Innovation Partnerships Program

Much of what we gain from our space exploration is in the scientific and technological progress that comes in the process of doing it. Many of those technologies are the direct result of NASA supported funding for both internal R&D projects performed at NASA centers and external research from the small business community. As a result of these expanding needs for new capabilities to explore space, NASA missions often result in technologies which have applications beyond aerospace. These technologies while targeted for integration into the mainstream NASA flight programs, can also be commercialized creating new marketplace products and provide opportunities for improving the quality of life for the American public right here on earth.


For NASA, Technology infusion is the process of strategically binding technical needs and potential solutions. These innovative solutions, be they hardware or software; enhancing or enabling; near-term or far-term; low Technology Readiness Level (TRL) or High TRL, NASA internally or externally developed; must all be managed through some aspect of transition from their originating source to the targeted challenges within NASA's programs and projects.


The IPP, Technology Infusion Element includes the Small Business Innovative Research (SBIR), the Small Business Technology Transfer (STTR) and theIPP Seed Fund. Together these programs provide pathways from these originating sources to IPPs' technology portfolio, and provide enabling infrastructures that enhance the infusion of these technologies in NASA missions and programs. These programs allow the agency to implement successful technology infusion and receive benefits in the following ways:

  • Leverage limited program funds for technology development

  • Leverage partners' funds/investments to achieve NASA's research and development (R&D) goals

  • Avoid additional program cost by providing a portfolio of technology solutions

  • Accelerate technology maturation through concurrent Research and Development

  • Make informed decisions when selecting technologies for programs/projects/missions (i.e., better trade space information)

  • Increase the return on its R&D investment with additional marketplace applications of technologies (benefits for both NASA and the public.


  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Business Science Technology

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

TRON LEGACY and DIGITAL 3D TECHNOLOGY

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Microsoft NEW Technology

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Annular Solar Eclipse of January 15

The first solar eclipse of 2010 occurs at the Moon's ascending node in western Sagittarius. An annular eclipse will be visible from a 300-km-wide track that traverses central Africa, the Indian Ocean and eastern Asia (Espenak and Anderson, 2008). A partial eclipse is seen within the much broader path of the Moon's penumbral shadow, which includes eastern Europe, most of Africa, Asia, and Indonesia.

The annular path begins in westernmost Central African Republic at 05:14 UT. Because the Moon passes through apogee two days later (Jan 17 at 01:41 UT), its large distance from Earth produces an unusually wide path of annularity. Traveling eastward, the shadow quickly sweeps through Uganda, Kenya, and southern Somalia while the central line duration of annularity grows from 7 to 9 minutes.

For the next two hours, the antumbra crosses the Indian Ocean, its course slowly curving from east-southeast to northeast. The instant of greatest eclipse occurs at 07:06:33 UT when the eclipse magnitude will reach 0.9190. At this instant, the duration of annularity is 11 minutes 8 seconds, the path width is 333 kilometers and the Sun is 66° above the flat horizon formed by the open ocean. Such a long annular duration will not be exceeded for over 1000 years (3043 Dec 23).

The central track continues northeast where it finally encounters land in the Maldive Islands (07:26 UT). The capital city Male experiences an annular phase lasting 10 minutes 45 seconds This is the longest duration of any city having an international airport in the eclipse track.

When the antumbra reaches Asia the central line passes directly between the southern tip of India and northern Sri Lanka (07:51 UT). Both regions lie within the path where maximum annularity lasts 10 minutes 15 seconds Quickly sweeping over the Bay of Bengal the shadow reaches Burma where the central line duration is 8 minutes 48 seconds and the Sun's altitude is 34°.


  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Latest Mobile Phone Technology

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Preventive Care Continues; Science on Hold

Preventive CareDuring analysis of four safe-mode events this year, engineers for NASA's Mars Reconnaissance Orbiter project have identified a vulnerability to the effects of subsequent events. They are currently developing added protection to eliminate this vulnerability while they continue analysis of the string of incidents this year in which the spacecraft has spontaneously rebooted its computer or switched to a backup computer.

The team is keeping the Mars Reconnaissance Orbiter in a precautionary "safe" mode, with healthy power, temperatures and communications, while continuing analysis and precautions subsequent to the latest rebooting, on Aug. 26. Science observations will likely not resume for several weeks while this preventive care is the mission's priority.

The analysis identified one possible but unlikely scenario jeopardizing the spacecraft. This scenario would require two computer resets, each worse than any so far, occurring within several minutes of each other in a certain pattern.

The Mars Reconnaissance Orbiter, at Mars since 2006, has met the mission's science goals and returned more data than all other Mars missions combined. It completed its primary science phase of operations in November 2008 but remains an important contributor to science and to future landed missions. Continuing science observations are planned when the spacecraft is brought out of its current precautionary mode.

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Geo-Engineering Alternatives

Geoengineering might be a terrible idea, but it could also be the only option if efforts to slow carbon dioxide emissions maintain to fail, according to a new report by The Royal Society in London .

Broadly defined, geoengineering is any effort to counteract climate change on a huge scale. It includes two main approaches--pulling carbon dioxide out of the atmosphere (such as by increasing the growth of algae that take up carbon dioxide) or somehow decreasing the rate at which the sun heats the earth (such as by shading the planet or increasing the reflectivity of clouds).

In both cases, scientist doesn't know what might go wrong with the proposed schemes--their scale is unparalleled. According to John Shepherd, who chaired the new Royal Society's study, "used irresponsibly or without regard for possible side effects, geoengineering could have catastrophic consequences similar to those of climate change itself."

Yet if climate change starts to get out of control, we may be left with no alternatives. "Geoengineering and its consequences are the price we may have to pay for failure to act on climate change," Shepherd adds.

he study analyzed the planned geoengineering alternatives to decide which are most likely to work without disastrous consequences. Notably, one loom advocated publicly by Energy Secretary Steven Chu--painting roofs white to reflect sunlight--didn't come out well.


  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS